logo
專注油氣領域
與獨立思考者同行

挪油獲準在挪威北海兩油田鉆三口勘探生產井

中國石化新聞網訊 據Offshore網站8月17日斯塔萬格報道,挪威國家石油公司(挪油)日前從挪威石油安全管理局(PSA)獲得了在瓦萊蒙油田和吉娜克羅格油田分別鉆取兩口生產井和一口勘探井的許可。 挪油已從PSA獲得同意在位于挪威北海的瓦萊蒙油田使用“West Elara號”自升式鉆探平臺完成兩口生產井34/11-B-6井和34/11-B-16井的鉆井作業。鉆井作業預計將在9月或10月開始,兩口生產井的鉆井作業將持續160天。 在吉娜克羅格油田的15/6-14勘探井的鉆井作業將由“Maersk Integrator號”自升式鉆探平臺完成,鉆井作業將在9月份開始,鉆井現場水深為116米(381英尺)。如果是一口干井,鉆井作業估計將持續17天,如果獲得發現,鉆井作業估計將持續25天。 李峻 編譯自 Offshore 原文如下: PSA authorizes wells on Valemon, Gina Krog Statoil has permission from the Petroleum Safety Authority to drill two production wells on the Valemon field and an exploration well on the Gina Krog field. Statoil has received consent to use the jackup West Elara to drill and complete production wells 34/11-B-6 and 34/11-B-16 on the Valemon field in the Norwegian North Sea. Drilling is expected to start in September/October and last for 160 days. Exploration well 15/6-14 S on the Gina Krog field is to be drilled by the jackup Maersk Integrato. Water depth at the site is 116 m (381 ft). Drilling is estimated to last 17 days in the event of a dry well and 25 days in the event of a discovery, and will start in September.
?

未經允許,不得轉載本站任何文章:

av无码毛片久久精品白丝,国产成本人h动漫无码欧洲,成人无码影片精品久久久,亚洲一区无码精品网站性色