印度Indian Oil公司“API 5L管線采購”招標

招標單位:Indian Oil Corporation Limited(IOCL)
招標類型:Global Open E-Tender
招標編號:PLM/JPNPL/16/07

項目名稱:API 5L Grade Line Pipes & Station Pipes
招標內容:

S.No. Pipe Wall

Thk.

API Gr. Type of

Coating

Manufacturing

Process

Stockpile Location Total

Quantity

(Meter)

OD

Line Pipes

1 12.75″ 0.25″ ? 5LX46 PSL2 3LPE ERW/ Seamless Kotputli:149256m

Sampla: 148080m

297336
2 12.75″ 0.312″ 5LX46 PSL2 3LPE ERW/ Seamless Kotputli: 20148 m

Sampla: 5568 m

25716
3 12.75″ 0.375″ ? 5LX46 PSL2 3LPE ERW/ Seamless Kotputli: 2340 m Sampla: 1596 m 3936
4 12.75″ 0.438″ 5LX46 PSL2 3LPE ERW/ Seamless Kotputli: 12792 m

Sampla: 4692 m

17484
5 12.75″ 0.375” 5LX46 PSL2 Bare ERW/ Seamless Kotputli: 192 m

Sampla: 192 m

384
6 18” 0.312” 5LGr. B Bare ERW/ LSAW/

HSAW

Kotputli: 300 m

Sampla: 480 m

780

Total

345636

Station Pipes

1 16” 0.375” 5L X52 Bare ERW/ Seamless Mohanpura: 2652m 2652
2 12.75” 0.375” 5L X52 Bare ERW/ Seamless Mohanpura: 180m 180
3 10.75” 0.365” 5L X52 Bare ERW/ Seamless Mohanpura: 48m

Rewari: 552m

Panipat: 468m

1068

Total

3900

注意事項:標書費:免費
投標保證金:USD 81,000
標書發售周期:2016.7.18-2016.8.16
標前會議時間:2016.7.27 15:00 p.m.
投標截止時間:2016.8.16 14:00 p.m.
開標時間:2016.8.17 15:00 p.m.

注意事項:
1. The stockpile location for Line pipes is Kotputli (Rajasthan) & Sampla (Haryana) to be arranged and maintained by bidder.
2. The stockpile location for Station Pipes is Mohanpura (Rajasthan), Rewari (Haryana) & Panipat (Haryana) of IOCL.
3. In the tender where the option of ERW/LSAW/ HSAW pipe is given, the bidder in its offer shall indicate the type of pipe manufacturing process considered.
4. As per-meter rate to be indicated in BOQ is all inclusive rate (inclusive of all levies and taxes) at stockpile location, bidder shall indicate applicable rate of excise duty and CST considered in their per-meter rate, in respective column given in BOQ for reference purpose.
5. C-form shall not be issued for this procurement.
6. Commencement of delivery within 4 months from the date of PO and completion within 8 months from the date of PO, with continuous delivery of pipes during this period. This is for complete scope of work including unloading and stacking of pipes at respective stockpile locations.