馬拉西亞公司Wah Seong Corporation (WSC)獲得價值6億歐元合同,為俄羅斯Nord Stream 2北方管道復線項目提供管道涂層服務。該項目將俄羅斯天然氣經波羅的海供應到歐洲市場。
早在今年7月,WSC子公司Wasco Coatings Europe BV便獲得了為Nord Stream 2項目提供混凝土配重涂層和管道存儲服務的機會,但合同的簽署有待各方最終協定。
該項目完成后,世界最大氣田生產的天然氣將跨越1200公里供應給歐洲消費者。Nord Stream 復線項目將仿照Nord Stream一號管線設計,并沿原管道線路鋪設,兩條管線自圣彼得堡東南部起,一直延伸到德國海岸城市Greifswald。
來自/Offshore Energy Today 9月13日消息? 編譯/趙美園石油圈原創www.h29736.cn
Malaysia’s Wah Seong Corporation (WSC) has signed a 600 million euros contract for the supply pipe coating services for the Nord Stream 2 pipeline, which will carry Russian gas to Europe through the Baltic Sea.
To remind, WSC’s subsidiary Wasco Coatings Europe BV was selected for the job in July, however, the contract signing was subject to final negotiations. The company will provide provision of concrete weight coating and storing of pipes for the Nord Stream 2 project.
Once completed, Nord Stream 2 pipeline will transport natural gas over 1,200km from the world’s largest gas reserves in Russia to consumers in Europe. Nord Stream 2 will follow the route and design of the first Nord Stream pipeline, each starting from south-west of St Petersburg and ending at German coast, Greifswald.
未經允許,不得轉載本站任何文章:
-
- 趙美園
-
石油圈認證作者
- 畢業于南開大學翻譯專業,具有豐富的翻譯經驗。致力于迅速、準確地傳遞國際油氣行業新聞簡訊。會時刻關注油氣行業最新動態,呈現最迅捷、優質的國際油氣資訊,讓中國企業時刻把握國際油氣動向,抓住商機,創造世界油氣行業精彩未來。